Product Details

Rated 5.00 out of 5

E-Flite EFL5967 Cirrus SR-22T Scale Plastics Set – Metro Hobbies

Having completed nearly 90,000 miles of test running since new, Sir Nigel Gresley's W1 4-6-4 No. 10000 entered Darlington Works on 21 August 1935 for what was anticipated to be a major overhaul and modification. During this period Gresley decided that it was time to rebuild 10000 as a three cylinder locomotive with a conventional firetube boiler. Subsequently, 10000 was moved to the Doncaster Works on 13 October 1936 and this is where the first drawing for the modification were being prepared. When 10000 was finally released from Doncaster Works in November 1937, it was a significantly different locomotive, being fitted with a diagram 111 boiler that was very similar to the diagram 108 boiler fitted to No. 2006 'Wolf of Badenoch', and with a streamlined casing to the same pattern as the A4 class. As many components as possible

29.00 - 53.00